North Terrace and The Appian Way, Bankstown
Description: Installation of 9 m cast in-situ base and 9 m pre-cast culverts.
Date: Current
Description: Installation of 9 m cast in-situ base and 9 m pre-cast culverts.
Date: Current
Description: Installation of cast in-situ base with 6m precast stormwater crowns under a shop awning with multiple conflicting underground services; Relocate DN375 and DN200 water mains
Date: Current
Description: Construct inlet structure into Sydney Water stormwater culvert; lay-up approx. 130m of 900mm and 750mm RCP with multiple pits
Date: August 2023
Description: Install approx. 240m of 3.6m x 1.8m culverts (precast crowns and cast in-situ bases)
Date: June 2023
Description: Disuse 600mm water main; install shut gate valve
Date: June 2022
Description: Relocate 450mm sewer main and multiple 1800 DTC manholes including penstock chamber; construct and install approx. 170m of 6m wide culverts
Date: December 2021
Description: Demolish existing manhole and replace with 1800mm manhole; install approx. 180m of culverts; relocate 200mm water main
Date: October 2020
Description: Construct 450mm stormwater inlet into Sydney Water culvert; lay-up approx. 200m of stormwater pipe with multiple pits
Date: August 2020